Service / PMO & Governance

SOC 2 Readiness: Prepared Before The Auditor Arrives.

Readiness work covers scoping, control design, evidence collection and audit coordination, so the independent examination starts from a prepared position.

The Problem

Readiness Is Not Attestation.

A SOC 2 report is issued only by an independent CPA firm after its examination. Readiness work happens before that: scoping the system, designing controls and producing the evidence the auditor will test.

Dominate Ignite does the readiness work and coordinates with the auditor. It does not issue reports or opinions.

Delivered by PMO & Compliance Governance · Led By Kathleen Reynolds

What It Covers

The Scope Is Stated Specifically.

  • Scope DefinitionSystems, Trust Services Criteria and boundaries are agreed.
  • Gap AssessmentCurrent controls are compared against the criteria.
  • Control DesignPolicies and controls are assigned named owners.
  • Evidence StagingEvidence is captured as controls operate and organized for testing.
  • Audit CoordinationThe team works alongside the CPA firm the client engages.

Operating Methodology

The Method Runs In This Order.

  1. 01

    Scope Evaluation

    Agree the report type, scope and timeline.

  2. 02

    Gap Assessment

    Identify what is missing.

  3. 03

    Remediation

    Design and operate controls.

  4. 04

    Audit Support

    Coordinate the independent examination.

Evidence And Limits

Readiness work does not constitute a SOC 2 examination, report or opinion. Only an independent CPA firm can issue a SOC 2 report.

Questions And Objections

Buyers Ask These Questions Before They Commit.

Type I or Type II?

Type I examines control design at a point in time; Type II examines operating effectiveness over a period. The choice is confirmed during scope evaluation.

Does Dominate Ignite perform the audit?

No. The client engages an independent CPA firm. Dominate Ignite prepares and coordinates.

How long does readiness take?

It depends on scope and current maturity. A Type II report also requires an observation period.

Next Step

The Next Step Starts With The Right Question.

Each service has one primary next step, matched to its problem. No call to action routes to a generic contact form.